Call us

(613) 804-9999

Free estimation

Click here

76 RUTILE STREET

Rockland, Ontario K4K0M6

$649,999 for sale



MLS®:
1412625
Contract Days:
66
Community:
Morris Village
Ownership:
Freehold
Property Type:
Residential House , Detached
Total Size:
39.86 ft X 105.28 ft
Built Date:
2025
Parking:
3
Bedrooms:
3+
Bathrooms:
2
Interior Features

Construction Style:
Detached
Total Stories:
2
Total Bedrooms:
3
Bedrooms Above Ground:
3
Bedrooms Below Ground:
Total Bathrooms:
2
Whole Bathrooms:
1
Half Bathrooms:
1
Basement Type:
Full (Unfinished)
Basement Development:
Unfinished
Appliances:
Hood Fan
Exterior Features

Built Date:
2025
Exterior Finish:
Brick, Siding
Foundation Type:
Poured Concrete
Utitilies

Heating Type:
Forced air
Heating Fuel:
Natural gas
Cooling Type:
None
Utility Water:
Municipal water
Sewer:
Municipal sewage system
Total Fireplaces:
Type
Level
Size
2pc Bathroom
Main level
Measurements not available
Living room
Main level
11'4" x 9'11"
Dining room
Main level
15'1" x 9'11"
Kitchen
Main level
9'1" x 16'6"
Other
Main level
5'0" x 5'9"
Foyer
Main level
7'0" x 5'0"
Other
Second level
4'0" x 5'9"
Bedroom
Second level
12'1" x 11'0"
Bedroom
Second level
11'8" x 12'3"
Laundry room
Second level
Measurements not available
4pc Bathroom
Second level
11'10" x 7'11"
Other
Second level
5'6" x 11'4"
Primary Bedroom
Second level
18'3" x 12'8"

Note

Thoughtfully designed, this under construction ‘The Hubert (E1)’ model is a stunning 2-story single-family home model offering 1690 sq/ft of a-g living space, 3 bedrooms, 1.5 bathrooms, 1-car garage, and open concept living. Welcome to 'Beaumont' in Morris Village, where you'll discover a newly developed area, strategically located to offer a harmonious blend of tranquility, access to amenities & a convenient 25-minute drive to Ottawa. Crafted by Landric Homes (aka the multi-award-winning ‘Construction LaVérendrye’ in QC), this purpose-built 2-story home will leave you in awe. Construction LaVérendrye, renowned for their expertise, reliability, dedication to excellence & timely project delivery, consistently upholds these standards in every community they develop. Home is under construction, closing date is as early as June 2025 (TBD). Price & specs may be subject to change without notice. Photos are of a previously built 'The Hubert' (id:19004)

Disclaimer



This REALTOR.ca listing content is owned and licensed by REALTOR® members of The Canadian Real Estate Association.